Log inSign up free
  • Home
  • Jobs
    • Applications
    • Career
    • Resume
    • Cover letters
  • Studio
  • More tools
    • Profile
    • Hiring
  • Settings
All jobs
GRGalactic Resource Utilization Space, Inc. (GRU Space) logo

Galactic Resource Utilization Space, Inc. (GRU Space)

Location not stated

Moon Base Program: Senior Mechanical Engineer.

FULL TIMESENIOR LEVELENGINEERING
Y CombinatorOpen menu
About
What Happens at YC?ApplyYC Interview GuideFAQPeopleYC SoftwareYC Blog
Companies
Startup DirectoryFounder DirectoryLaunch YC
Library
Y Combinator
Partners
Resources
Startup SchoolNewsletterRequests for StartupsFor InvestorsVerify FoundersHacker NewsBookfaceSAFEFind a Co-FounderEvents
Startup Jobs
Log inApply

GRU Space

Moon Hotel -> The Intergalactic Construction Company of Earth

Moon Base Program: Senior Mechanical Engineer

$160K - $210K•0.25% - 0.75%•Hawthorne, CA, US
Job type
Full-time
Role
Engineering, Mechanical
Experience
5+ years
Visa
US citizen/visa only
Skills
CAD Design
Connect directly with founders of the best YC-funded startups.
Apply to role ›
Skyler Chan
Skyler Chan
CEO
Skyler Chan
Skyler Chan
CEO

About the role

Build the machine that makes bricks on the Moon.

GRU Space’s Moon Base Program is developing a robotic factory designed to manufacture humanity’s first bricks on the lunar surface. You’ll own the mechanical hardware that handles regolith, mixes and forms material, and releases finished bricks.

You’ll take our working prototype through flight design, manufacturing, assembly, integration, and verification, preparing an integrated payload for delivery to a lunar lander provider and operation on the Moon.

This is a full-time, in-person role in Hawthorne, Los Angeles, with hands-on ownership from CAD to the shop floor to the flight unit.

What you’ll do:

  • Own mechanical hardware from concept and design trades through drawings, fabrication, assembly, testing, and flight delivery.
  • Develop mechanisms for regolith handling, metering, mixing, forming, and brick release in close collaboration with materials and electronics engineers.
  • Design actuators, joints, seals, enclosures, mounting, launch restraints, and pressure or thermal provisions as required by the selected manufacturing process.
  • Build instrumented prototypes and test fixtures, reproduce failure modes, and iterate until the hardware performs repeatably.
  • Run and interpret structural and mechanism analyses, checking loads, stiffness, tolerances, thermal expansion, wear, dust effects, and margins against test results.
  • Own the mechanical portions of the lander interface control document (ICD), coordinating interfaces and fit checks with the lander provider and payload lead.
  • Work directly with suppliers and machinists, manage mechanical long-lead items, and maintain drawings, assembly procedures, and as-built records.
  • Support vibration, thermal-vacuum, and integrated functional testing. Resolve anomalies and document the evidence needed for payload acceptance.

What we’re looking for:

  • You’ve personally taken flight hardware through design, manufacturing, assembly, and testing, and can explain the systems and decisions you owned.
  • Deep fluency with CAD, engineering drawings, GD&T, tolerances, and FEA. You understand your model’s assumptions and verify predictions against hardware.
  • Practical experience with mechanisms, actuators, seals, granular-material handling, robotics, or process equipment.
  • Strong debugging instincts: you can trace a failed test to its root cause, change the design, and verify the fix.
  • The ability to own a subsystem while working across materials, electronics, controls, and manufacturing.
  • Daily use of current AI tools to accelerate engineering workflows, with responsibility for checking the results.
  • High ownership, resourcefulness, and clear communication when the hardware or schedule is at risk.

Experience with lunar hardware, vacuum-compatible mechanisms, and environmental qualification is especially relevant.

How to apply:

Share technical work you’re proud of. Show what you personally designed and built, what failed, how you fixed it, and the test results that demonstrated it worked.

If you want to build hardware that helps humanity establish a permanent presence beyond Earth, we’d like to hear from you.

About GRU Space

GRU builds off-world habitats using in-situ resource utilization technology, turning local material into building material.

We’re developing an integrated flight payload for delivery to a lunar lander provider and operation on the Moon. The mission is designed to manufacture bricks from lunar regolith. A second mission will begin laying the hotel’s foundation in a lunar cave. A third mission will open the first lunar hotel, targeted 2032.

We don’t stop at Moon hotels. GRU’s long-term plan:

  1. Build the first hotel on the Moon. GRU solves off‑world surface habitation.
  2. Build America’s first Moon base: roads, mass drivers, warehouses, and physical infrastructure.
  3. Repeat on Mars and build the first cities there.
  4. Own property on the Moon and Mars as these economies grow.
  5. Reinvest profits into resource utilization systems on the Moon, Mars, asteroids, and beyond—reaching our final form: Galactic Resource Utilization.

GRU Space is backed by investors in SpaceX + Anduril, and is part of Nvidia’s Inception program.

GRU Space
GRU Space
Founded:2025
Batch:W26
Status:
Active
Location:Los Angeles, CA
 
X (Twitter) logo
 
Founders
Skyler Chan
Skyler Chan
CEO
Skyler Chan
Skyler Chan
CEO

Footer

Y CombinatorY Combinator

Make something people want.

Programs

  • YC Program
  • Startup School
  • Work at a Startup
  • Co-Founder Matching

Resources

  • Startup Directory
  • Startup Library
  • Investors
  • Demo Day
  • SAFE
  • Hacker News
  • Launch YC
  • YC Deals

Company

  • YC Blog
  • Contact
  • Press
  • People
  • Careers
  • Privacy Policy
  • Notice at Collection
  • Security
  • Terms of Use
TwitterTwitterFacebookFacebookInstagramInstagramLinkedInLinkedInYoutubeYouTube

© 2026 Y Combinator

Pay
Not stated
Where
Not stated
Work
Not stated
Type
Full time
Posted
19 Nov, 2026
Apply on the original postingSign in to apply

Unverified board

more at Galactic Resource Utilization Space, Inc. (GRU Space).

19 Nov, 2026

Galactic Resource Utilization Space, Inc. (GRU Space)

Moon Base Program: Senior Electronics Engineer

GRGalactic Resource Utilization Space, Inc. (GRU Space) logo
  • Full time
  • Senior level
  • Engineering

Location not stated

Full time

Details
19 Nov, 2026

Galactic Resource Utilization Space, Inc. (GRU Space)

Moon Base Program: Founding Materials Engineer

GRGalactic Resource Utilization Space, Inc. (GRU Space) logo
  • Full time
  • Engineering

Location not stated

Full time

Details