Log inSign up free
  • Home
  • Jobs
    • Applications
    • Career
    • Resume
    • Cover letters
  • Studio
  • More tools
    • Profile
    • Hiring
  • Settings
All jobs
GRGalactic Resource Utilization Space, Inc. (GRU Space) logo

Galactic Resource Utilization Space, Inc. (GRU Space)

Location not stated

Moon Base Program: Senior Electronics Engineer.

FULL TIMESENIOR LEVELENGINEERING
Y CombinatorOpen menu
About
What Happens at YC?ApplyYC Interview GuideFAQPeopleYC SoftwareYC Blog
Companies
Startup DirectoryFounder DirectoryLaunch YC
Library
Y Combinator
Partners
Resources
Startup SchoolNewsletterRequests for StartupsFor InvestorsVerify FoundersHacker NewsBookfaceSAFEFind a Co-FounderEvents
Startup Jobs
Log inApply

GRU Space

Moon Hotel -> The Intergalactic Construction Company of Earth

Moon Base Program: Senior Electronics Engineer

$165K - $220K•0.25% - 0.75%•Hawthorne, CA, US
Job type
Full-time
Role
Engineering, Electrical
Experience
5+ years
Visa
US citizen/visa only
Skills
C, C++
Connect directly with founders of the best YC-funded startups.
Apply to role ›
Skyler Chan
Skyler Chan
CEO
Skyler Chan
Skyler Chan
CEO

About the role

Build the electronics and software that run a factory on the Moon.

GRU Space’s Moon Base Program is developing a robotic factory designed to manufacture humanity’s first bricks on the lunar surface. You’ll own the avionics and embedded software that power the payload, control its mechanisms, run the manufacturing process, and report what happened.

You’ll take the system from prototype instrumentation through flight hardware, integrated testing, and delivery for lunar lander integration. This is a full-time, in-person role in Hawthorne, Los Angeles.

What you’ll do:

  • Own the avionics architecture: computing, power distribution and conditioning, sensors, actuator interfaces, harnessing, grounding, and electrical protection.
  • Design and bring up controller boards and mixed-signal electronics. Evaluate purchased modules and make practical build-versus-buy decisions with the payload lead.
  • Write embedded C/C++ for payload sequencing, closed-loop control, data logging, watchdogs, and fault detection and recovery.
  • Own the payload’s electrical and data interfaces with the lunar lander, including interface control documents (ICDs), command definitions, telemetry, and interface verification.
  • Design and integrate harnesses for the payload’s mechanisms and sensors, accounting for routing, shielding, strain relief, and environmental requirements.
  • Build hardware-in-the-loop tests and inject faults: power interruptions, sensor failures, stalled mechanisms, communications loss, and resets.
  • Assess component suitability for the mission’s thermal and radiation environments, working with specialists where needed.
  • Maintain flight software releases, test evidence, and as-built documentation. Develop ground tools for integration, mission rehearsals, and lunar operations.

What we’re looking for:

  • You’ve personally architected and delivered a flight avionics system or substantial spacecraft electronics subsystem from concept through launch.
  • Full-cycle PCB experience: schematic, layout, fabrication, bring-up, and in-system debugging.
  • Embedded C/C++ experience controlling physical hardware, including state machines, watchdogs, and fault handling.
  • Practical power electronics experience, including conditioning, protection, actuator drivers, and power budgets.
  • Experience defining and debugging serial interfaces such as RS-485, including framing, error detection, and recovery.
  • Strong bench skills: you can trace a fault across a board, harness, sensor, and firmware using an oscilloscope, logic analyzer, and debugger.
  • Familiarity with spacecraft wiring, grounding, shielding, and electromagnetic compatibility.
  • Clear technical communication and the ability to work closely with mechanical, materials, and thermal engineers.

Experience with lunar payloads, radiation-tolerant electronics, motor and valve controls, onboard storage, and mission operations is especially relevant.

How to apply:

Share technical work you’re proud of. Describe the hardware and software you personally owned, a difficult failure you resolved, and the tests that showed your system was ready to fly.

If you want to build the systems that help humanity establish a permanent presence beyond Earth, we’d like to hear from you.

ITAR Requirements

To conform to U.S. Government space technology export regulations, including the International Traffic in Arms Regulations (ITAR), you must be a U.S. citizen, lawful permanent resident of the U.S., protected individual as defined by 8 U.S.C. 1324b(a)(3), or eligible to obtain the required authorizations from the U.S. Department of State.

About GRU Space

GRU builds off-world habitats using in-situ resource utilization technology, turning local material into building material.

We’re developing an integrated flight payload for delivery to a lunar lander provider and operation on the Moon. The mission is designed to manufacture bricks from lunar regolith. A second mission will begin laying the hotel’s foundation in a lunar cave. A third mission will open the first lunar hotel, targeted 2032.

We don’t stop at Moon hotels. GRU’s long-term plan:

  1. Build the first hotel on the Moon. GRU solves off‑world surface habitation.
  2. Build America’s first Moon base: roads, mass drivers, warehouses, and physical infrastructure.
  3. Repeat on Mars and build the first cities there.
  4. Own property on the Moon and Mars as these economies grow.
  5. Reinvest profits into resource utilization systems on the Moon, Mars, asteroids, and beyond—reaching our final form: Galactic Resource Utilization.

GRU Space is backed by investors in SpaceX + Anduril, and is part of Nvidia’s Inception program.

GRU Space
GRU Space
Founded:2025
Batch:W26
Status:
Active
Location:Los Angeles, CA
 
X (Twitter) logo
 
Founders
Skyler Chan
Skyler Chan
CEO
Skyler Chan
Skyler Chan
CEO

Footer

Y CombinatorY Combinator

Make something people want.

Programs

  • YC Program
  • Startup School
  • Work at a Startup
  • Co-Founder Matching

Resources

  • Startup Directory
  • Startup Library
  • Investors
  • Demo Day
  • SAFE
  • Hacker News
  • Launch YC
  • YC Deals

Company

  • YC Blog
  • Contact
  • Press
  • People
  • Careers
  • Privacy Policy
  • Notice at Collection
  • Security
  • Terms of Use
TwitterTwitterFacebookFacebookInstagramInstagramLinkedInLinkedInYoutubeYouTube

© 2026 Y Combinator

Pay
Not stated
Where
Not stated
Work
Not stated
Type
Full time
Posted
19 Nov, 2026
Apply on the original postingSign in to apply

Unverified board

more at Galactic Resource Utilization Space, Inc. (GRU Space).

19 Nov, 2026

Galactic Resource Utilization Space, Inc. (GRU Space)

Moon Base Program: Founding Materials Engineer

GRGalactic Resource Utilization Space, Inc. (GRU Space) logo
  • Full time
  • Engineering

Location not stated

Full time

Details
19 Nov, 2026

Galactic Resource Utilization Space, Inc. (GRU Space)

Moon Base Program: Senior Mechanical Engineer

GRGalactic Resource Utilization Space, Inc. (GRU Space) logo
  • Full time
  • Senior level
  • Engineering

Location not stated

Full time

Details